In this workshop we’ll be utilizing a job scheduler to control resources on the nodes such that
many jobs can run at once without impacting one another. The choice for the workshop is to use
the open source version of PBS Professional (PBS Pro). A basic PBS Pro configuration is fairly
simple to set up.
 
The scheduler packages will be installed on all nodes, however only the head node will actually
facilitate the scheduling of jobs. We’ll utilize the Puppet configuration management system to
install the RPM for the scheduler on all nodes, then distribute an appropriate configuration file.

 

http://www.linuxclustersinstitute.org/workshops/archive/may2017/assets/pdfs/8a-Scheduler_Install_Config.pdf 

Post a Comment

Previous Post Next Post